
Altera Corporation Quartus II Version 3.0 5–5
Perform the Production Diagnostic Tests Set Up the Board
Figure 5–6. Attach the XCVR HM-Zd Loopback Card
7. Attach the SFP loopback card (labeled J3 on the card) to the SFP
transceiver connector at J54 as shown in Figure 5–7.
Figure 5–7. Attach the XCVR SFP Module
8. Attach the XPAK module to the XPAK transceiver connector at U27
as shown in Figure 5–8.
Commentaires sur ces manuels